Sign In | Join Free | My futurenowinc.com
China Wuhan Rising Electric Co., Ltd. logo
Wuhan Rising Electric Co., Ltd.
Active Member

6 Years

Home > Transformer Test Bench >

No Load And Load Loss Test Transformer Test Bench IEC 60076 Standard

Wuhan Rising Electric Co., Ltd.
Contact Now

No Load And Load Loss Test Transformer Test Bench IEC 60076 Standard

Brand Name : RISING

Model Number : RSBTT III

Certification : ISO CE

Place of Origin : China

MOQ : 1 Set

Payment Terms : T/T, Western Union, MoneyGram,L/C, D/A, D/P,

Supply Ability : 100 SET PER Month

Delivery Time : 20 working days

Packaging Details : Wooden package for export

Voltage : 0.1-800V

Current : 0.1-300A

Power : U*I

Power factor : 0.1-0.9999

Power supply : AC380V±10% 50Hz±2%

Working temperature : 0-40℃

Relative humidity : 30%-90%

Outline dimension : Customization

Contact Now

Full Automatic Transformer Testing Equipment No-load and Load Loss Test Transformer Test Panel Test board

IEC 60076

Product Description
Introduction of system composing and technical parameters
1 To satisfy three-phase, one-phase measurement, transformer no-load and load should come to the following requirements:
Voltage measuring range: 0~650V, current measuring range: 10mA~2A,
Accuracy: 0.2 class; power: U*I, Accuracy: 0.2 class;
Power factor: 0.050~1.000,accuracy: 0.2 class;
Frequency: 40—70Hz, accuracy: 0.1 class; three-phase total power P;
No-load current I.%,No-load loss P.;
Load loss PK,impedance voltage UK;
Three frequency Pa(Pab),Pb,Pc(Pbc);
Average three-phase line voltage Un;
Average three-phase current In. (including 19 harmonic wave analysis)
2. High-voltage precision current transformer should meet
the following requirements:
Rated operation voltage: 3kV
Withstand voltage:4kV
Capacity: 1VA
Measuring range: 0.1A~200A;
Accuracy: 0.05 class
The ratios are 200A,100A,50A,25A,10A,5A,2.5A/1A, total 7 steps.
3. High precision Voltage transformer should meet the
following requirements:
Rated operation voltage: 3kV
Withstand voltage: 4kV
Capacity: 1VA
Measuring range: 0.01kV~3kV;
Accuracy: 0.05 class;
The ratios are 3kV,2kV,1kV,0.5kV/0.1kV, total 4 steps. 7
4. 250kVA three-phase voltage regulator should meet the
following requirements:
Capacity;250kVA
Input voltage:380V
Output voltage:20-650V
Max load current: 222A
When the input voltage is steady,the voltage regulator can stepless and smoothly adjust the output voltage.
Technical Parameters:
Item
Scope of Measurement
Relative Error
Voltage
0.1-800V
±(0.2% reading + 0.1% range)
Current
0.1-300A
±(0.2% reading + 0.1% range)
Power
U*I
±(0.2% reading + 0.1% range)
Power factor
0.1-0.9999
±3 figures
Power supply
AC 380V±10% 50Hz±2%
Operating condition
Working temperature: -20℃-40℃ Relative humidity <90%
Outline dimension
Customization
Weight
Customization

Product Tags:

transformer test machine

      

transformer test panal

      
Wholesale No Load And Load Loss Test Transformer Test Bench IEC 60076 Standard from china suppliers

No Load And Load Loss Test Transformer Test Bench IEC 60076 Standard Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Wuhan Rising Electric Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)